DC Aashika Jain Inspects ongoing work of Derabassi-Barwala Road
Directs the PWD Officials to complete the work in stipulated time

Derabassi : As per the commitment made by the Punjab Chief Minister S. Bhagwant Singh Mann to the Industrial Associations in the Sarkar-Sanyatkar Milni, to renovate the Derabassi-Barwala road’s stretch blogging to Punjab soon, the work has been started on the 7.20 KM long stretch, said DC Aashika Jain,here,today.
Taking stock of the ongoing work at Derbassi,today, she said that the estimated amount of the repair and strengthening work has been pegged at Rs 19.4 Core. The repair and renovation would include a 5 KM long drain alongwith the road, raising of reaches (rising of ground level) at three stretches of total 1.25 KMs, replacement of a damaged bridge across the road besides patch work of potholed parts before laying 50 MM of BC.
She said that beside interstate connectivity of this road, industry across the road and having residences of air force personnel, the road has too much importance and needs renovation as it was earlier repaired eight years ago.
The Deputy Commissioner accompanied by the SDM Derabassi Himanshu Gupta, asked the Executive Engineer PWD (National Highways) Yuvraj Singh Bindra to ensure the proper monitoring of the renovation project of road by adhering all the specifications strictly.
She added that District Administration would not face any difficulty to the residents and it would be taken care of their problems well. She asked the SDM to make sure the disposal water of local shops to the sewer line across the road by directing the local municipal council.
Comments are closed.